Listed House Refurbishment
BONNYGATE
Project
Refurbishment of a 19C merchant’s house conserves the traditional features whilst upgrading it to create a light-filled contemporary family home.
When our clients, Polly and Graham, bought the house, they knew they had found their dream home. It had traditional stone details and a delightful private garden in the heart of the historic Royal Burgh of Cupar, but it was now in a sorry state. After years as a B&B, suffering from botched repairs and ill-conceived improvements, it was left with a lot of small, dark, shabby spaces. The kitchen and bathrooms were inadequate, as well being run down. The electrics and heating were also both outdated and insufficient, not to mention the leaking roof, draughty windows, threadbare carpets and neglected decoration.
Originally built in early 19th Century, the merchant had his shop on the ground floor and living accommodation on the three floor above. Whilst the shop faced the bustling street, the private apartments were accessed through a side passageway leading to a striking stone entrance in tranquil gardens to the rear. The shop had long been sold off, but the hidden garden still surprised and provided a delightful approach to a special home.
Polly and Graham dreamt of a creating a bright modern home, whilst retaining the traditional features and original craftsmanship of the Listed Building, and so engaged SHS BURRIDGE ARCHITECTS to provide the creative vision and pilot the project to completion.
Project
Refurbishment of a 19C merchant’s house conserves
Location
Bonnygate, Cupar, Fife, KY15, Scotland
Client
Private (return client)
Services
Design
SHS BURRIDGE ARCHITECTS brought their visionary approach to the design, which was key to the success of the refurbishment, making clever use of the available space to create a bright modern home.
The principal floor was significantly reconfigured. Walls were removed to open up the space across from front to back and allow light to flow across from both sides. New frameless glass walls were introduced to enclose area but retain the light and sense of space. A French door with Juliet balcony was formed to give a view over the garden and the drawing room was stripped back to reveal the original early Victorian details.
The second floor was rearranged to remove redundant lobbies and form three double bedrooms and a generous family bathroom. The already ample landing was enlarged slightly to form a library for the clients’ extensive collection of books.
On the neglected top floor, the space was used to form a master bedroom and bathroom along with an spacious studio and work space.
Planning Permission
Planning Permission was required and successfully achieved by SHS BURRIDGE ARCHITECTS for the French doors, Velux rooflights and upgrading of the sash windows.
Listed Building Consent
Listed Building Consent was required and achieved by SHS BURRIDGE ARCHITECTS for the French doors, Velux rooflights and upgrading of the sash windows.
Building Warrant
A Building Warrant was required, and successfully achieved by SHS BURRIDGE ARCHITECTS, to carry out the works. The Warrant covers various aspects of the design and construction to protect the health, safety, welfare and convenience of occupants.
Contract Administration
SHS BURRIDGE ARCHITECTS acted as the contract administrators, managing the procedural aspects of a contract, for the building phase of the works. As well as visiting site to inspect the works and dealing the day-to-day issues that arose, this included handling the procedural aspects of the building contract, such as dealing with variations, valuations and payment payment certificates.
SHS Burridge Architects
- Design
- Planning Permission
- Listed Building Consent
- Building Warrant
- Contract Administration
Photography
Zoe Maxwell
Result
The amount of the work required to fully refurbish and upgrade the house was extensive and too costly for the clients to undertake in one go. However, Polly and Graham saw this as a long-term commitment to their family home and so the project was divided into three phases.
The first phase was remodelling and upgrading the principal floor, containing the kitchen, dining room, and living room. Here, we knocked down walls between the front and back to create one large open plan space for the kitchen and dining room. This opened-up two formerly dark enclosed rooms, with a frameless glass wall and door defining the area whilst enhancing the brightness and sense of space.
One of the challenges we faced, as is often the case with refurbishment projects, was removing walls without elaborate, and expensive, structural works. Our approach is always to have the structure in mind as we design the space. With this renovation, we carefully selected which walls to remove to create the space we envisaged so that we only had to demolish one structural wall and add one steel beam.
In the kitchen, we converted an existing window into a French door with Juliette balcony. This is one of my favourite design moves that we have developed for refurbishment projects, being very simple but very effective. Only a small section of non-loadbearing wall has to be removed but it brings in more light, improves the view out and the connection with the garden, enhancing the ambiance of the room.
Phase II involved the second and third floors. On the second floor, we renovated and enlarged the bathroom with contemporary fittings and new wall and floor tiles. We refurbished the three bedrooms, and by removing one partition and moving another, we increased the size of one bedroom and created a library space from the existing generous landing. On the top floor, we added a new bedroom and bathroom as well as a good-sized studio and office for the clients to work from home.
For the final phase, we dealt with stonework and roof repairs. The front elevation had several areas of cracked and badly weathered stones and the chimney also had stones pitted by mason bees collecting material for their nests.
Conservation stonemasons replaced deteriorated stonework, including lintels and cills, which they dressed so that the tooling matched identically the original features. The chimney was largely rebuilt with missing chimney pots reinstated, and all areas of stonework were repointed with traditional lime mortar. This both restored the original aesthetic of the building but more importantly, the lime mortar helps retain the stone’s resilience and extend its life, unlike cement mortar which progressively damages stonework over time.
Defective slate work on the roof was replaced, and faulty mortar skews, where rainwater had been leaking in, were rebuilt to give a lasting watertight solution.
We were delighted with this renovation project. The refurbished house now has a robust outer shell of traditional construction, restoring its original 19th century appearance, while the inside has been transformed, to meet the client’s particular requirements, into a contemporary family home adapted to modern living.