Description
A bright, modern laboratory designed to both reflect and contribute to the university’s growing status as a top learning and research institution.
Heriot-Watt University was established on an historic parkland estate at Riccarton, southwest of Edinburgh, in the late 1960s. A visionary example of a redbrick university when built was now showing its age. The old cellular classrooms and separate laboratories of the James Nasmyth Laboratory no longer suited contemporary teaching models and, after 40 years, the building fabric was tired.
Over the past few decades, universities have come under increasing competitive pressure to attract the best students in order to generate world class research. This made investing in their facilities a priority and the faculty department approached us to design and facilitate the upgrading of these laboratories and teaching spaces.
Project:
James Nasmyth Building
Laboratory Refurbishment
Location:
Heriot-Watt University, Riccarton, EH14 4AS
Client:
Heriot-Watt University
Heriot-Watt University Gallery
Services
SHS Burridge Architects, Services provided:
Design
Building Warrant
Contract Administration
Consultants:
Harley Haddow building services engineers
Contractor: SJS Property Services
Contractor:
SJS Property Services
Result
The existing facility had been divided into a number of small, enclosed rooms which felt confined and outdated.
Our approach was to open up the space to create a single, open plan, teaching and lab space, with generous storage for laboratory kit. This creates a much more flexible space for both classroom teaching and hands-on lab work and a space that readily accommodates different sized classes.
As well as opening up the internal space, we removed the main dividing wall and introduced a glass partition to reveal the facility to the rest of the James Nasmyth Building. This created a visual connection within the space, instead of closing everything off in small silos.
Installing the epoxy resin floor for the teaching space floor improved safety and meant that any oil leaks or other chemical spills can be easily cleaned up. Likewise, the fixed worktops we installed and mobile workbenches were designed to be durable and easy to clean, assisting their maintenance and longevity.
We also included features to ensure chemical containment and restrict contamination between rooms in, accordance with safety standards.
The upgrade also included renovating wall finishes, a full window refurbishment as well as a replacing the existing piped gas and electricity services to current standards.
One of the challenges was having to work while the building remained in use by staff and students. We ensured that careful planning of the works and good site communication caused minimal disruption to building users, while maintaining appropriate safety measures.
The end result is a modern, bright and professional lab and teaching space – much more appropriate for a top, 21st century research centre and one of the top Scottish and UK universities.