Energy efficiency improvements
Edinburgh College of Art
Hunter Building, University of Edinburgh

Description

Refurbishment that cut the cost of energy lost through the windows by 85%.

Built in the late 1970s with red ashlar sandstone, the Hunter Building is both stately yet distinctly modern, helping it join the exclusive club of Listed 20th Century buildings.

The clever composition forms a courtyard space with the earlier main college building, reminiscent of an Oxbridge quadrangle. The red stone reflecting the fire station and original college building, creating a unified composition with its A Listed neighbours.

After 40 years of use, the original windows were in a poor state of repair. The timber frames were showing signs of rot, and the ironmongery was starting to fail. However, most importantly, the windows were single-glazed, making the building expensive to heat and environmentally unsustainable.

In the 1970s single glazing was still the norm, and it was just accepted that they were cold and had a poor U-value of around 5.2W/m²K. Since then, energy prices have risen substantially, and the climate change catastrophe has been revealed. This has driven the development of glazing so that today, a U value of 0.7W/m²K is not unusual, potentially cutting the heat loss through a window by 85%.

Project:
Window Replacement

Location:
Lauriston Place, Edinburgh

Historic & Architectural Designation:
Grade B Listed
New Town Conservation
Area
Edinburgh New Town
World Heritage Site

Client:
The University of Edinburgh

Edinburgh College of Art Gallery

Services

The design challenge for us was to find a glazing system that performed to current standards but had a profile similar to the original windows and would not have a detrimental aesthetic impact. Senior Aluminium Systems Ltd had glazing and curtain-walling products that both performed well and was aesthetically appropriate for a Listed Building.

The site stages of the project were complicated by the fact that the work had to be carried out over successive summer holidays to limit the disruption to teaching. In addition, the work had to be carried out in tandem with a separate stone refurbishment contract being undertaken by specialist stonemasons. Early on in the works, a further complexity was added to the mix when it was discovered that the original stone lintels to the windows had failed. These also then had to be replaced in conjunction with replacing the window whilst maintaining the integrity of the stone cladding.

SHS Burridge Architects, Services provided:
Design
Tender Documentation & Action
Contract Administration

Photographer:
Zoë Maxwell

Result

OThe refurbishment gave the building a refreshed appearance and restored its original stature. Functionally, it improved the comfort for the building users and significantly reduced the heat loss. As a result, both building running costs were reduced and a positive contribution made to climate change targets.