A HOMEOWNER’S GUIDE TO BUILDING PROJECTS

Carrying out building work at home is not something most people do every day. There seem too many things you know nothing about or even where to start. There’s the design, Planning Permission, and the Building Regulations, what about timescales and costs, do I need an engineer and what’s a quantity surveyor, and then there are builders to contend with – it can all feel very daunting. Fortunately, we at SHS BURRIDGE ARCHITECTS do deal with these things every day and so, with years of experience behind us, we have put together this step-by-step guide to help you navigate your way to success.

 

Whether you want to take down a wall or move your kitchen, renovate your flat, convert the attic, build an extension or even your dream house, the steps are broadly the same.

STEP 1: BEFORE YOU CALL AN ARCHITECT

Work out what you would want to do, this is your BRIEF and what you are thinking of spending, this is your BUDGET. 

STEP 2: YOUR BRIEF

This only needs to be a simple list, but you might want to think about:

 

  1. Location: Address where the site is and description.
  2. Overview: identify the reasons for the project, including any specific problems or challenges that need to be addressed and what is there at the moment.
  3. Functional requirements: this might be increasing space, adding, or improving facilities or improving energy efficiency. You might divide this into Must Have & Nice to Have
  4. Repairs and maintenance: itemise any defects which you would like to be fixed.
  5. Timeline: are there any deadlines or time constraints associated with the work? Is it best to do all the work at once, and only have one lot of disruption, or is it better to carry out several smaller projects as you can afford them?

Example Briefs for SHS BURRIDGE ARCHITECTS

EXTENSIONS

EXTENSION

Location: Craiglockhart, Edinburgh. Existing post-war semi-detached house.

Overview: We would like to extend our house to create more living space.

Functional Requirements: We need a new kitchen and sitting area with a woodburning stove and patio doors on to a new deck. 

Repairs & Maintenance: None.

Timeline: We are getting married in the autumn of next year and would like to start the building works after that.

 

EXTENSION

Location: Prestonfield, Edinburgh. Existing Edwardian ground floor flat.

Overview: Demolish the original utility room offshoot and replace with a new shower room and utility room extension.

Functional Requirements: Shower room and utility room with door access to the back garden. 

Repairs & Maintenance: The back garden is slightly higher than existing building and the current extension has problems with damp.

Timeline: We visit our son abroad for three months during the summer each year and would like to have the building work done whilst we are away.

REFURBISHMENT

REFURBISHMENT

Location: Cupar, Fife. Existing 19C building. 

Overview: Refurbish and remodel a rundown B&B to turn it back to a family home. C Listed Building in a Conservation Area.

Functional Requirements: New kitchen and bathrooms. Remove internal walls to create an open-plan living area. Create a workspace, bedroom & bathroom in the attic. Rewire and install new central heating.

Repairs & Maintenance: Rotten windows, leaking roof and areas of defective stonework.

Timeline: For financial reasons, the work needs to be carried out in three phases.

 

REFURBISHMENT

Location: Murrayfield, Edinburgh. Existing Victorian 3-storey townhouse. 

Overview: Refurbish, remodel and upgrade an existing home. The house is in a Conservation Area.

Functional Requirements: Take down a dividing wall to create a large kitchen and dining room. Replace the boiler and hot water cylinder, install underfloor heating to the ground floor and new radiators to the upper floors. Rewire and bathrooms. Remove internal walls to create an open-plan living area. Create a workspace, bedroom & bathroom in the attic. Rewire and install new central heating.

Repairs & Maintenance: Rotten windows, leaking roof and areas of defective stonework.

Timeline: For financial reasons, the work needs to be carried out in three phases.

BESPOKE ECO-HOUSE

BESPOKE ECO-HOUSE

Location: Nethy Bridge, Scottish Highlands. 

Overview: Build a new one-off house in the Cairngorms National Park. There is an existing dilapidated 1930s cottage on the site and large mature trees to the rear of the property.

Functional Requirements: New four-bedroom house with two ensuite bathrooms, a boot room for wet coats and boots and a large open-plan living dining and kitchen space. Externally space for a hot tub and seating area, a double garage with facilities to clean and maintain mountain bikes. We would like the design to be highly insulated and include full Smart Home and integrated technology.

Repairs & Maintenance: Low maintenance.

Timeline: No particular deadlines and we would like to enjoy being involved with the design process.

NEW BUILD HOUSE

NEW BUILD HOUSE

Location: Milton of Leys, City of Inverness, Highland Council Area. Serviced greenfield site.

Overview: A one-off, innovative and eco-friendly detached, CLT, eco-house on a greenfield site. 

Functional Requirements: 2 bedrooms, 2 bathrooms, living, dining and kitchen spaces. Garage and off-street parking.

Repairs & Maintenance: Not applicable.

Timeline: Must be completed by summer next year.

GARDEN ROOM EXTENSION

GARDEN ROOM EXTENSION

Location: Trinity, Edinburgh. 1st floor flat in a converted Victoria villa.

Overview: We would like an extension which gives us a new entrance and stair to our 1st floor flat. A sunroom at ground level, to connect our home to the garden, and an office space.

Functional Requirements: Garden room and office space and small kitchenette. New entrance and stair, with space for coats and shoes. Storage space for bikes and garden equipment.

Repairs & Maintenance: Existing stone walls need repointing.

Timeline: As soon as feasible. 

STEP 3: YOUR BUDGET

Setting a budget for your project is a crucial step to ensure that the project stays within your financial means. Here are key factors to consider when establishing a budget:

  1. What can you afford? 
  2. What would it cost to move to a property that already has what you want? In addition to the cost of the new property, there will be the fees for both buying and selling, as well as remover’s costs and probably stamp duty (Land and Buildings Transaction Tax).
  3. Is the property an investment? If so, you will need to weigh the cost of the works against the increase in value of your property. There may be a maximum price that a property will achieve in your area at the moment. However, if you are intending to stay in the property for any length of time, property prices tend to rise anyway.
  4. How important is your home to you? It is often said that a home is more than just a house, a place where you spend a more time than anywhere else, where families are brought up and memories are made. 
  5. Is there a cost to not carrying out the project? Buildings deteriorate over time and your property is likely to be devalued if it is not maintained. 

COST

The cost of building projects is impacted by a lot of variables. Particularly at the start, when there are multiple options, precise predictions are not possible, but as decisions are made, the potential price range is reduced. Part of the design process is an ongoing exercise to align the cost with your budget.  Here are some factors that influence the cost:

 

  1. The extent of the works. It may be an obvious point, but the more you do the higher the price. The cost of an extension, for instance, will be directly related to the floor area.
  2. The nature of the works and the type of space. A bathroom or kitchen is always going to be more expensive than a bedroom, and a dormer window is inevitably more costly than a rooflight.
  3. The choice of materials and finishes. For properties in Conservation Areas and for Listed Buildings, the choice of materials will be more limited, and the cost of traditional construction, such as stonework or leadwork, will tend to be higher.
  4. The unexpected. Particularly working with existing buildings, you can actually expect that there will be some additional costs, even if you cannot predict exactly what will crop up. Including a contingency sum in your budget is wise. A common rule of thumb is to set aside 10-15% of the total budget for contingencies.
  5. The choice of builder. There is a huge range of builders and in broad terms, the more you are willing to pay, the better the quality and the fewer the headaches. The assessment you must make is whether what you get is good value for what you pay.
  6. Where you are building. Across the country construction costs vary depending on local factors. In addition, there will be site conditions, such as accessibility and ground characteristics, that will also impact the costs.
  7. COST – QUALITY – TIME. It is not possible to have a project that is cheap, quick, and fast, and so you need to decide where your priorities lie.
  8. COST: VALUE. It is also worth pointing out that cost is not the same thing as value. Cost is objective whereas value is subjective. Something can be both cheap and highly valued by one person but not another. Equally a high price does not mean a thing has a high value for everyone.

STEP 4: NOW CALL YOUR ARCHITECT

Once you have an idea about what you want, what your timescale is and how much you want to spend, call your architect. 

For a prompt response to questions about your project, including:

    • What consents are required, application fees & timescales
    • Other consultants
    • Architect’s services & fees

Contact SHS BURRIDGE ARCHITECTS with your project details here and we will give you a detailed response to your queries by the end of the next working day.

If you would like to talk through your ideas with an architect before you commit, book an appointment with SHS BURRIDGE ARCHITECT.

You may find you have various ideas and struggle to decide exactly what you want to do and how you want to do it. SHS BURRIDGE ARCHITECTS can prepare a feasibility study to look at the options at an early stage. We will visit the site and then prepare a number of design alternatives to allow you to compare different arrangements and help you maximise the potential of your home.

Your architect can help you navigate the work stages of your project from the inception to completion on site and afterwards, providing services throughout following a standard route:

Work Stage 1 • PREPARATION

  1. Outline your aims for the project and discuss your brief, budget, and timescale. If you are not entirely sure about what to do or how to achieve what you want, you may get your architect to prepare a feasibility study.
  2. Your architect will need information about the site. A measured survey of buildings and possibly the land (a topological survey) will be required to prepare drawings of the existing layout. This may be carried out by your architect but certainly for the largest projects a surveyor will do it. Depending on the site and what work you want to do, other surveys may also be required, such as a tree survey, flood risk or ecological surveys.
  3. There are Health & Safety issues with building projects, covered by the CDM Regulations 2015, which you should be aware of. However, for domestic clients doing work in their own homes, your duties are not very onerous and normally pass to your Principal Contractor. There is an option to appoint your architect as the Principal Designer under CDM 2015, but this requires a written agreement and will entail an additional fee. [LINK TO HSE GUIDANCE https://www.hse.gov.uk/pubns/indg411.pdf]

Work Stage 2 • INITIAL DESIGN

Taking the project information, your architect will begin to create a fusion with the opportunities and the numerous constraints, that fulfils your brief and appeals to your aspirations. This may be an iterative process progressing through various design options, influenced by topography, climate and addresses statutory regulations, construction, structure & environmental control (heating, lighting & ventilation). 

Work Stage 3 • PLANNING

There are two main statutory stages that your project will need to pass through:

  • Planning and 
  • Building Control. 

 

Although these are both administered by your Local Authority, they are completely independent of each other, looking at different facets of the project and are covered by different pieces of legislation. Obtaining Planning Permission is no help in achieving Building Regulations Approval. Equally, it is quite easy to obtain Building Regulations approval for a building that would never obtain Planning Permission. 

 

Consequently, making the applications concurrently runs the risk of abortive work and, potentially, incurring more cost. For this reason, we recommend applying for Planning Permission first, even though it might be a slower process.

 

Your neighbours, within 3m of your boundary, will be notified of Planning Application and so we recommend speaking to them first so that it is not such a surprise. The Planners may receive objections but by no means does this necessarily result in a refusal, and only legitimate concerns within the terms of the legislation would be taken into consideration.

 

In Scotland, the Planning Application fee is £300, to carry out work to your own home. A Decision should be issued within 8 weeks and works then must commence within three years.

 

Some building works are covered by Permitted Development Rights and do not require Planning Permission. You can confirm whether this applies to your works by obtaining a Certificate of Lawfulness, which can be useful particularly when you come to sell your property. If you apply retrospectively, the fee is the same as a Planning Application but applying in advance of doing the works, the fee is only half that amount. 

 

Buildings and areas of special architectural or historic interest have additional protections under Planning legislation:

 

Conservation Areas define localities with particular characteristics. These characteristics are taken into consideration when the Planners assess proposals but there is no specific or additional application required for buildings in Conservation Areas.

 

Listed Buildings come in three categories of significance A, B or C in Scotland, Grades I, II* or II in England. “A” Listed Buildings are of national or international importance whereas category C buildings are of local importance, including more modest or traditional types. Listed Building Consent (LBC) applications are required unless you’re just renewing elements on a like-for-like basis and the repair work doesn’t affect the character of the building. They are in addition to any Planning Application and are usually made at the same time. The assessment process for LBC also takes 8 weeks but there is no application fee.

 

Listing gives additional protection to buildings but there is a lot of scope for what works are acceptable, and some of SHS BURRIDGE ARCHITECTS’ most innovative projects have involved Listed Buildings. 

Work Stage 4 • BUILDING CONTROL

In Scotland, Building Regulations approval is called a Building Warrant which is required before you start for work such as:

  • building a new home
  • extending your home
  • building or removing load bearing walls in houses or any walls in flats
  • altering roofs, external walls, or other structural elements
  • converting a loft or garage into a room
  • demolishing a building

 

It’s an offence to start this sort of building work without a Warrant and you could be fined.

 

The Building Warrant application fee is related to the cost of the work – see Application Fees [LINK TO FEES https://www.ebuildingstandards.scot/eBuildingStandardsClient/custompages/feecalculator.aspx]. An initial technical report should be issued by Building Standards 4 weeks after submission and the Warrant within a further 4 weeks. Building Warrants last for three years from the date of issue.

 

For smaller projects, most people engage their architect just to deal with the Planning and Building Warrant applications, however once it comes to spending tens or hundreds of thousands of pounds, clients prefer to have professional support throughout the project.

Work Stage 5 • CONSTRUCTION DOCUMENTATION

Although the Building Warrant drawings describes what needs to be done, they do not necessarily describe how or what it should look like. This leaves somethings open to interpretation and, whilst you are dreaming of something beautiful that lasts a lifetime, your builder might be thinking what is cheapest and easiest for him to do.

 

Construction documentation consists of a combination of drawings, schedules, specifications, and descriptions, which attempts to reduce the ambiguity and produce a building of a particular quality, durability, and aesthetic. 

 

Whilst your architect is developing the technical design, they will be liaising with the other design consultants for the project, such as engineers who will be carrying out calculations and designing the structure, and quantity surveyors who prepare Bills of Quantities, and co-ordinating their information. This design development process varies in length depending on the size and complexity of the building but is likely to take a few weeks rather than a few months.

Work Stage 5 • CONSTRUCTION DOCUMENTATION

Although the Building Warrant drawings describes what needs to be done, they do not necessarily describe how or what it should look like. This leaves somethings open to interpretation and, whilst you are dreaming of something beautiful that lasts a lifetime, your builder might be thinking what is cheapest and easiest for him to do.

 

Construction documentation consists of a combination of drawings, schedules, specifications, and descriptions, which attempts to reduce the ambiguity and produce a building of a particular quality, durability, and aesthetic. 

 

Whilst your architect is developing the technical design, they will be liaising with the other design consultants for the project, such as engineers who will be carrying out calculations and designing the structure, and quantity surveyors who prepare Bills of Quantities, and co-ordinating their information. This design development process varies in length depending on the size and complexity of the building but is likely to take a few weeks rather than a few months.

Work Stage 6 • TENDER ADMINISTRATION

Contractors are generally selected through competitive tendering, which follows a formal protocol:

 

  1. Tender Documents: Your architect or QS will prepare the Tender Document, consisting of the Construction Documentation plus some additional, project specific, documents they have prepared. 

 

  1. Contractor preselection: A number of builders are preselected as having the appropriate skills to deliver the project. An initial enquiry will then be sent to them to find out if they have the capacity to do the work and are interested in tender. Once between three and six contractors have agreed to tender, the tenders will be issued. 

 

  1.  Tendering: Tenders are sent out confidentially (to avoid price fixing) for pricing, to be returned on a set date, about 3 to 4 weeks later. During the tender period, the contractor will calculate his costs and obtain prices from subcontractors and ideally, he will visit the site.

 

  1. Tender report: The design team will open the tenders once the return has time has passed, assess them, checking for numeric accuracy and prepare a tender report comparing the returns and identifying exclusions, substitutions, and provisional sums. 

 

  1. Contractor Selection: You are not obliged to appoint the contractor with the lowest price. You might consider that one of the other tenders offers better value or that you do not want to proceed with any of them.

Work Stage 7 • CONTRACT ADMINISTRATION

Once you have chosen your contractor, the design team will usually prepare one of the standard forms of contract such as the JCT Minor Works Contract or, for larger, more complicated projects, the JCT Standard Building Contract. 

 

A written contract provides significant protection to both parties. It confirms what has been agreed between you and the builder, exactly what he is going to do and what he will be paid, it sets out the Start Date and Date for Completion, and the arrangements for payment, variations and disputes. 

 

The contract is between you (the Employer) and the builder (the Contractor), but the architect will be named as the Contract Administrator who is then the point of contact between the two parties. 

 

Before the works start on site, your architect should hold a Pre-Start Meeting to agree arrangements on site including access, security, insurance and programme, as well as use of electricity, toilets and kitchen facilities. 

 

Whilst the works are on site, your architect will visit site to inspect the works, meet the contractor and address any technical or other design questions and the point of contact with your builder is through your architect.

ARCHITECTS INSTRUCTIONS

Often, as the project progresses, issues arise, things are discovered about the existing building, or you may decide to make changes. However, even with the smallest of building projects, there is often joiners, electricians, plumbers, heating engineers, bricklayers or masons and labourers, as well as your structural engineer and architect and so communication is critical. The protocol within the Contract for variations is the Architect’s Instruction, which serves the following purposes:

 

  1. Ensures clarity, with a defined route of communication and avoid conflicting instructions.
  2. Acknowledges potential cost & programme implications, in either direction.
  3. Records what has been agreed and has to be carried out.
  4. Reduces risk for the client. Potentially it is in your builder’s interest to steer you towards what is cheapest and quickest for him and not what is in the best long-term interest of the project. With your Architect’s input technical and aesthetic implications of changes are considered and reduces the risk of contractor hoodwinking the client.

PAYMENT

You sometimes hear about builders asking for payment upfront. This is very risking and leaves clients in an extremely vulnerable position. 

 

The contract provides for staged payments, so that you only ever pay for work that has been carried out. On a regular agreed basis, usually monthly, your architect, will inspect the works and come to an assessment of the cost of work so far. As an additional protection, a Retention, often 5%, is withheld and released only after the work is complete. Your architect authorises what is due to the contractor in the form of an Interim Certificate. This identifies the total value of work that has been carried out, the Retention, the total previously certified and the net amount for payment.

VAT

The rate of VAT on building works varies depending on what work is being done. Some things are zero-rated, others have a reduced rate whilst most works are charged at the standard rate, all of which can be varied by the Chancellor of the Exchequer. Costs are often discussed excluding VAT and so you need to be aware.

OVERRUNNING

Projects might not finish by the Date for Completion because of variations or exceptionally bad weather but, if the delay is caused by the builder, then the Contract allows for damages to be paid. An Extension of Time can be granted to the contractor for legitimate reasons, (Relevant Events), but not where the builder could have prevented the delay, and that’s when you can claim Liquidated Damages, a daily or weekly sum written into the contract to cover your likely out-of-pocket expenses.

PRACTICAL COMPLETION

Towards the end of the works on site, the electrician and heating engineer will carry out final testing and commissioning, and your architect carry out snagging and prepare a Schedule of Defects. Once the works are complete, defects rectified and you are able to take possession, your architect will issue a Practical Completion Certificate.

BUILDING WARRANT COMPLETION CERTIFICATE

To complete the Warrant process, you will need a Building Warrant Completion Certificate. This needs to be done before you move into a new build and within 3 years of the date of issue of the Warrant, otherwise you will need to extend or even reapply for it. For simple projects you can make the Completion Certificate submission yourself but for bigger projects, your architect should deal with this. 

STEP 5: RELAX

The hard work is done, and you can now move back into your refreshed home and enjoy. Your architect will still be taking care of things behind the scenes.

RECTIFICATION PERIOD

Practical Completion marks the start of the Rectification Period. Its length is agreed in the Contract but ideally it should be 12 months so that the building cycles through all four seasons, and during this time, your Architect can instruct the Contractor to rectifying any defects that come to light. At Practical Completion, half the Retention can be released to the contractor. At the end of the Rectification Period, your architect will carry out a final inspection, and once any defects have been attended to, they will issue their final certificates, the remaining Retention can be released, and the final account settled. 

If you have any questions about the process or would like further help please contact us now at SHS BURRIDGE ARCHITECTS.